What is the cable route for the windfarm?
The underground cable linking the windfarm to the power system will terminate at the existing Ballabeg sub-station.
There is no requirement to upgrade our network to accommodate the windfarm as the windfarm will export power at the same capacity as our Transmission network. There is no requirement to build any additional sub-stations as part of our development.
The following diagram shows the proposed illustrative cable route for the development.