Business tariffs
Standard electricity charges (NA, NC) are levied in respect of commercial premises which are supplied with electricity which comprises a daily standing charge and a consumption based unit charge below. When signing up for your new tariff why not also sign up for Direct Debit and e-billing which will provide you with an extra £1.50 discount on your quarterly bill.
|
Unit charge Pence per unit |
Standing charge Pence per day |
| 29.5p | 25.5p |
What is the EV Commercial Tariff?
The Electric Vehicle Commercial Tariff is a two‑rate tariff designed specifically for charging electric vehicles at commercial properties.
With this tariff, your site will benefit from 7 hours of discounted electricity every day, helping to reduce EV charging costs.
To use this tariff, you will need a separate electricity meter or supply dedicated solely to electric vehicle charging.
No other equipment can be connected to this meter or supply.
Who is it for?
This tariff is available to customers on a Commercial or Maximum Demand tariff who have off‑road parking suitable for EV charging equipment.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
| Peak | Off Peak | Standing Charge |
| 7am - Midnight | Midnight - 7am | |
|
29.5p Per Unit |
19.7p Per Unit |
25.5p Per Day |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST). However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the Commercial Plus Tariff?
The Commercial Plus Tariff is a two‑rate tariff designed for commercial properties that use electric heating systems such as air source heat pumps, ground source heat pumps, or storage heaters.
With this tariff, your property will benefit from 8 hours of discounted electricity every day, helping to reduce heating costs.
To qualify, the property must have a minimum electric heating load of 6 kW.
Who is it for?
This tariff is available to commercial customers who use air source heat pumps, ground source heat pumps, or storage heaters as part of their electric heating system.
To qualify, your agreed supply capacity must be:
- Up to 15 kVA for single‑phase supplies, or
- Up to 50 kVA for three‑phase supplies
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
|
Peak |
Off Peak |
Standing Charge |
|
7am -11pm |
11pm- 7am |
|
|
29.5p per unit |
17.4p per unit |
25.5p per day |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- Equipment must be hardwired. Plug‑in devices unfortunately don’t qualify.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the Economy 8 Commercial Tariff?
The Economy 8 Commercial Tariff is a two‑rate tariff designed for commercial customers who can make use of lower‑cost electricity during off‑peak hours.
With this tariff, your property will benefit from 8 hours of discounted electricity every day, helping you reduce energy costs by shifting usage overnight.
Who is it for?
This tariff is suitable for commercial customers who consistently use at least 30% of their total daily electricity consumption during off‑peak hours.
It is available to customers with an agreed supply capacity of:
- Up to 15 kVA (single‑phase), or
- Up to 50 kVA (three‑phase)
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
| Peak | Off Peak | Standing Charge |
| 7am - 11pm | 11pm - 7am | |
|
29.5p Per Unit |
18.7p Per Unit |
25.5p Per Day |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?

* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the Economy 8 Demand Tariff?
The Economy 8 Demand Tariff is a two‑rate tariff designed for maximum customers who can make use of lower‑cost electricity during off‑peak hours.
This tariff can be applied at either Low Voltage (LV) or High Voltage (HV), depending on the maximum demand your site requires.
With this tariff, your property will benefit from 8 hours of discounted electricity every day, helping you reduce energy costs by shifting usage overnight.
Who is it for?
This tariff is available to commercial and industrial customers whose property requires a supply greater than 50 kVA and consistently use at least 30% of their total daily electricity consumption during off‑peak hours.
Please be aware that this tariff includes monthly maximum demand charges as well as agreed supply capacity charges.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
|
Peak |
Off Peak |
Standing Charge |
|
7am -11pm |
11pm- 7am |
|
|
26.7p per unit |
18.7p per unit |
44.5p per day |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 12:00am to 08:00am (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings
* Monthly Maximum Demand Charge
This charge is based on the highest half‑hour demand recorded during the month, with a minimum chargeable level of 50 kVA.
The rate is £2.86 per kVA per month (plus VAT).
** Monthly Agreed Supply Capacity (ASC) Charge
This charge is based on the capacity you have agreed for your site.
If your usage exceeds this agreed capacity in any month, penalty charges will apply.
- ASC charge: £1.56 per kVA per month (plus VAT)
- Penalty charge for exceeding ASC: £33.72 per kVA per month
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
If you require a supply more than 50kVa you can apply for our Economy 8 Demand Tariff.
What is the Maximum Demand Tariff?
The Maximum Demand Tariff is a single‑rate tariff designed for commercial and industrial customers with higher electricity requirements.
This tariff can be applied at either Low Voltage (LV) or High Voltage (HV), depending on the maximum demand your site requires.
Who is it for?
This tariff is available to commercial and industrial customers whose property requires a supply greater than 50 kVA.
Please be aware that this tariff includes monthly maximum demand charges as well as agreed supply capacity charges.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
Rates
|
Unit Rate |
Standing Charge |
Demand |
|
Pence per unit |
Pence per day |
|
|
26.7p per unit |
44.5p per day |
£2.86 per kVA |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
* Monthly Maximum Demand Charge
This charge is based on the highest half‑hour demand recorded during the month, with a minimum chargeable level of 50 kVA.
The rate is £2.86 per kVA per month (plus VAT).
** Monthly Agreed Supply Capacity (ASC) Charge
This charge is based on the capacity you have agreed for your site.
If your usage exceeds this agreed capacity in any month, penalty charges will apply.
- ASC charge: £1.56 per kVA per month (plus VAT)
- Penalty charge for exceeding ASC: £33.72 per kVA per month
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the High Load Factor Tariff?
The High Load Factor Tariff is a single low‑rate electricity tariff designed for industrial customers with consistently high and steady energy usage. It rewards sites that maintain a relatively flat demand profile, which supports efficient operation across the electricity network.
Who is it for?
This tariff is available to industrial customers who:
- Use more than 1 million kWh per year, and
- Maintain a load factor of at least 70% over a continuous 12‑month period.
To remain eligible, customers must demonstrate a sustained load factor above 70% based on the maximum kW recorded over the year.
If annual consumption falls below 1 million kWh or the load factor drops under 70% during any 12‑month period, the tariff will be withdrawn and replaced with a more suitable alternative.
Please be aware that this tariff includes monthly maximum demand charges as well as agreed supply capacity charges.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
Rates
| Peak | Off Peak | Standing Charge |
| 7am - 11pm | 11pm - 7am | |
|
19.9p Per Unit |
19.9p Per Unit |
44.5p Per Day |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
* Monthly Maximum Demand Charge
This charge is based on the highest half‑hour demand recorded during the month, with a minimum chargeable level of 50 kVA.
The rate is £2.86 per kVA per month (plus VAT).
** Monthly Agreed Supply Capacity (ASC) Charge
This charge is based on the capacity you have agreed for your site.
If your usage exceeds this agreed capacity in any month, penalty charges will apply.
- ASC charge: £1.56 per kVA per month (plus VAT)
- Penalty charge for exceeding ASC: £33.72 per kVA per month
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
High Volume
What is the High Volume Tariff?
The High Volume Tariff is a single‑rate tariff offering a slightly reduced unit price for customers with consistently high annual electricity usage.
Who is it for?
This tariff is available to customers who use more than 1 million kWh of electricity per year.
The reduced unit rate recognises the greater demand provided by high volume users.
To remain eligible, customers must continue to meet the annual usage requirement. If consumption drops below 1 million kWh in any 12‑month period, the tariff will be withdrawn and replaced with a more suitable alternative.
Please be aware that this tariff includes monthly maximum demand charges as well as agreed supply capacity charges.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
|
Unit Rate Pence per unit |
Standing charge Pence per day |
Demand per kVA |
| 25.3p | 44.5p | £2.86 |
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
Monthly Maximum Demand Charge
This charge is based on the highest half‑hour demand recorded during the month, with a minimum chargeable level of 50 kVA.
The rate is £2.86 per kVA per month (plus VAT).
** Monthly Agreed Supply Capacity (ASC) Charge
This charge is based on the capacity you have agreed for your site.
If your usage exceeds this agreed capacity in any month, penalty charges will apply.
- ASC charge: £1.56 per kVA per month (plus VAT)
- Penalty charge for exceeding ASC: £33.72 per kVA per month
High Volume - 2 Rate
What is the High Volume Two Rate Tariff?
The High Volume Two Rate Tariff is a discounted peak/off‑peak tariff designed for customers with high annual electricity usage who can shift a significant portion of their demand overnight. With this tariff, your property benefits from 8 hours of lower‑cost electricity every day.
Who is it for?
This tariff is available to customers who:
- Use more than 1 million kWh per year, and
- Consistently use at least 30% of their daily electricity during off‑peak hours.
The reduced unit rate recognises the greater demand provided by high volume users.
To remain eligible, customers must continue to meet both the annual consumption requirement and the 30% off‑peak usage threshold. If either condition is not met, the tariff will be withdrawn and replaced with a more suitable alternative.
Please be aware that this tariff includes monthly maximum demand charges as well as agreed supply capacity charges.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
Rates
| Peak | Off Peak | Standing Charge |
| 7am - 11pm | 11pm - 7am | |
| 25.3p Per Unit | 18.7p Per Unit | 44.5p Per Day |
* Monthly Maximum Demand Charge
This charge is based on the highest half‑hour demand recorded during the month, with a minimum chargeable level of 50 kVA.
The rate is £2.86 per kVA per month (plus VAT).
** Monthly Agreed Supply Capacity (ASC) Charge
This charge is based on the capacity you have agreed for your site.
If your usage exceeds this agreed capacity in any month, penalty charges will apply.
- ASC charge: £1.56 per kVA per month (plus VAT)
- Penalty charge for exceeding ASC: £33.72 per kVA per month
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the Public Lighting Tariff?
The Public Lighting Tariff is designed for unmetered lighting supplies, such as streetlights and traffic control equipment. Because these supplies are not metered, the responsible authority must provide regular updates on any changes to their installations—such as the location, type, rating, and operating hours of the equipment. This information must be submitted to the MUA every month to ensure accurate billing.
Who is it for?
This tariff is available to:
- Local authorities for public street lighting
- Highway authorities for traffic signals and control equipment
- Telecommunications providers where telephone kiosks require a lighting supply
Any supply registered on the Public Lighting Tariff must comply with the UK Electricity (Unmetered) Supply Regulations (SI 2001/3263). In general, these regulations apply where the electrical load is predictable and either:
- Less than or equal to 500 W, or
- It is impractical to install a meter for technical, financial, or legal reasons.
Rates
|
Unit charge Pence per unit |
Standing charge Pence per day |
| 28.6p | 0p |
What is the Commercial Sustainable Generation?
The Commercial Sustainable Generation Tariff is an add‑on to your existing electricity tariff that allows you to sell the renewable electricity you generate back to us at a fixed rate.
This tariff supports renewable installations with a maximum export capacity up to 50 kW.
Please note: this export capacity is subject to network studies and may be reduced if the installation could have a negative impact on the electricity network.
All renewable generation systems must meet the relevant ENA EREC G98, G99 or G100 Engineering Standards.
Who is it for?
This tariff is available to customers who install renewable generation equipment, such as:
- Solar PV panels
- Wind turbines
- Hydro generators
- Or a combination of these technologies
Because Isle of Man legislation differs from UK legislation, you must not connect any generation equipment to the Manx Utilities network until you have received written approval from us.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
Rates
| Rate | Charge |
| Unit | -9.7 per unit* |
- Payment for electricity units generated and sold to us.
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All renewable generation equipment must meet the relevant ENA EREC G98, G99 or G100 standards. Please see ENA Connect Direct for list of compliant devices.
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- Equipment must be hardwired. Plug‑in devices unfortunately don’t qualify.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
- Provide the relevant G98, G99, or G100 application forms.
Providing this information upfront helps us review your application quickly and avoid any delays.
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form
What is the Guaranteed Green Tariff?
The Guaranteed Green Tariff is an uplift to other tariffs that ensures electricity supplied to your premises is matched to renewable energy.
We will ensure that sufficient zero carbon electricity is sourced to meet your electricity supply requirements for the year (commencing 1 April annually). Securing of zero carbon electricity may be from Manx Utilities’ own generating stations or purchased from third-party generators, including importing of zero carbon electricity.
We will undertake an annual assurance process and publish a report annually on our website setting out the additional zero carbon electricity secured to meet Guaranteed Green Tariff customers’ electricity demand. The report will be certified by an external auditor.
Who is it for?
It is available to commercial and industrial customers. You must commit to a minimum 12-month duration for the green tariff and a 12-month notice period is required should you wish to cease using the tariff.
Existing ‘Green Tariff’ customers are permitted to switch to the Guaranteed Green Tariff and will need to apply in the same way.
Is there a Cost to Change Tariff?
Yes. There is a minimum charge to switch tariffs, which covers the engineering and administration work required.
If we need to make changes to your supply setup, there may be additional costs depending on the complexity of the work.
You can find the minimum tariff‑change cost on the Electricity Network Enquiry page.
Rates
Electricity units—both standard and off‑peak—and the standing charge are billed at the usual rates for your chosen tariff, plus an additional 1.5 pence per unit (plus VAT).
Please Note that the times stated are Greenwich Mean Time (GMT) and will alter during British Summer Time (BST) effectively become 01:00 to 08:00 (BST). It is the customers responsibility to synchronise their off-peak usage with the time displayed on the meters internal clock. However, if you have a smart meter installed it will be programmed to UTC and therefore there will be no requirement to adjust your time settings.
Before You Install Any Equipment
To make sure everything is safe and compliant, please speak to an electrical contractor. They will be able to assess your property and recommend the most suitable setup.
Important Information to Know
- All equipment installed must meet the current BS7671 IET Wiring Regulations.
- All electrical work must be carried out and certified by a qualified electrical contractor to ensure your installation is safe and compliant.
- Manx Utilities cannot recommend or endorse any contractors.
How Do I Apply?
To get started, simply complete an Electricity Network Enquiry form.
When you submit your form, please include:
- A clear photo of your electricity meter and the surrounding area
- Full details of all the equipment you plan to install
- Data sheets for each piece of equipment
What happens after I apply?
* Possible extra costs:
If any changes are needed to our network or to your service cable, additional charges may apply. This will depend on the complexity of the work required.
** For renewable generation systems:
You’ll also need to provide:
- Type Test Certification
- The relevant G98, G99, or G100 commissioning form